SCM Damping?shock absorber?Installation instructions
锟斤拷锟絙前锟斤拷請(q锟斤拷ng)锟絖锟絁(r锟斤拷n)锟斤拷锟斤拷锟斤拷锟紽(tu锟斤拷n)锟斤拷锟絲锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟斤拷號(h锟斤拷o)锟斤拷規(gu锟斤拷)锟斤拷锟角凤拷锟斤拷锟絖锟斤拷
Before installation,make sure the model and the specification are correct.
锟斤拷锟絙锟絝(shu锟斤拷)锟斤拷
Installation guide
锟斤拷锟借工锟竭o拷M10锟斤拷M12锟斤拷M14锟斤拷M16锟斤拷M20锟絖(k锟斤拷i)锟节帮拷锟街★拷
Required tools锟斤拷M10锟斤拷M12锟斤拷M14锟斤拷M16锟斤拷M20 open wrenches.
锟絲锟介附锟斤拷锟角凤拷锟絉全锟斤拷锟斤拷锟缴減锟斤拷锟斤拷锟角凤拷锟斤拷缺锟捷伙拷锟狡損锟斤拷锟斤拷锟斤拷D1锟斤拷
Check the isolator and other accessories see if they are all completely or having any defects.(Fig 1)
锟斤拷锟斤拷锟缴減锟斤拷锟斤拷锟脚碉拷锟絆(sh锟斤拷)锟斤拷陌锟斤拷b位锟斤拷锟斤拷锟斤拷锟斤拷D2锟斤拷
Place the isolator on the correct installation position.(Fig 2)
锟絠锟給锟斤拷母锟酵墊片锟斤拷锟絖锟斤拷锟絆(sh锟斤拷)锟斤拷蛷锟斤拷蓽p锟斤拷锟斤拷锟教讹拷锟斤拷位锟斤拷锟斤拷锟斤拷D3锟斤拷
Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.(Fig 3)
锟斤拷锟絙锟斤拷請(q锟斤拷ng)锟絲锟介彈锟斤拷锟铰夛拷锟斤拷锟斤拷锟界彈锟缴夛拷锟斤拷锟斤拷锟斤拷锟絫锟斤拷示锟斤拷锟截诧拷锟姐,锟絔(m锟斤拷i)锟叫減锟斤拷效锟斤拷锟斤拷锟斤拷(y锟斤拷ng)該锟斤拷锟絈锟絕锟斤拷锟斤拷氐膹锟斤拷蓽p锟斤拷锟斤拷锟斤拷號(h锟斤拷o)锟斤拷锟斤拷請(q锟斤拷ng)锟节憋拷锟斤拷司锟絀(y锟斤拷)锟斤拷(w锟斤拷)锟剿員聯(li锟斤拷n)系锟斤拷
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
锟斤拷锟絙锟絩(sh锟斤拷) 請(q锟斤拷ng)注锟解安全锟斤拷
Be cautious during the installation.
SCM锟酵忥拷锟缴減锟斤拷锟斤拷锟斤拷(sh锟斤拷)锟斤:
SCM type shock absorber parameter table:
SCM锟酵忥拷锟缴減锟斤拷锟斤拷锟結(ji锟斤拷)锟斤拷(g锟斤拷u)锟紻锟斤拷
SCM type shock absorber Structure drawing:
SCM锟酵忥拷锟缴減锟斤拷锟斤拷锟斤拷锟斤拷(sh锟斤拷)锟斤拷锟斤拷
SCM type shock absorber parameter table:
锟斤拷號(h锟斤拷o) Type |
锟斤拷锟斤拷d锟斤拷 Optimum load锟斤拷kg锟斤拷 |
锟斤拷锟轿尺达拷?Dimensions锟斤拷mm锟斤拷 | ||||||
H | D | L1 | L2 | d | d1 | |||
SCM-10 | 10 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-20 | 20 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-30 | 30 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-40 | 40 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-60 | 60 | 70 | 65 | 75 | 95 | 10 | 11 | |
SCM-80 | 80 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-120 | 120 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-160 | 160 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-240 | 240 | 110 | 85 | 105 | 125 | 12 | 11 | |
SCM-320 | 320 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-480 | 480 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-640 | 640 | 145 | 130 | 145 | 165 | 14 | 13 | |
SCM-820 | 820 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1000 | 1000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1280 | 1280 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-1500 | 1500 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2000 | 2000 | 150 | 190 | 210 | 245 | 16 | 15 | |
SCM-2700 | 2700 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-3500 | 3500 | 160 | 320 | 192 | 240 | 20 | / | |
SCM-4800 | 4800 | 160 | 320 | 192 | 240 | 20 | / |
锟斤拷锟紹(y锟斤拷ng)锟街拷锟矫匡拷锟揭拷^锟斤拷CS锟教讹拷锟斤拷栓锟角凤拷锟斤拷锟缴勶拷(d锟斤拷ng)锟斤拷锟斤拷锟街忥拷锟缴減锟斤拷锟斤拷锟斤拷锟絙锟絩(sh锟斤拷)锟斤拷锟斤拷锟铰夛拷锟较讹拷锟角凤拷锟斤拷锟斤拷锟斤拷
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.
锟紻1锟斤拷锟絲锟介附锟斤拷锟角凤拷锟絉全锟斤拷锟斤拷锟缴減锟斤拷锟斤拷锟角凤拷锟斤拷缺锟捷伙拷锟狡損锟斤拷
Fig 1锟斤拷Check the isolator and other accessories see if they are all completely or having any defects.
锟紻2锟斤拷锟斤拷锟斤拷锟缴減锟斤拷锟斤拷锟脚碉拷锟絆(sh锟斤拷)锟斤拷陌锟斤拷b位锟斤拷锟斤拷
Fig 2锟斤拷Place the isolator on the correct installation position.
锟紻3锟斤拷锟絠锟給锟斤拷母锟酵墊片锟斤拷锟絖锟斤拷锟絆(sh锟斤拷)锟斤拷蛷锟斤拷蓽p锟斤拷锟斤拷锟教讹拷锟斤拷位锟斤拷
Fig 3锟斤拷Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.