Before installation,make sure the model and the specification are correct.
锟斤拷锟絙锟絝锟斤拷
Installation guide
锟斤拷锟借工锟竭o拷锟斤拷锟狡口忥拷17mm锟斤拷M10锟斤拷锟斤拷19mm锟斤拷M12锟斤拷锟絖锟节帮拷锟斤拷锟斤拷爪式千锟斤拷.锟斤拷
Required tools锟斤拷17mm锟斤拷M10锟斤拷锟斤拷19mm锟斤拷M12锟斤拷open wrenches and claw jack.
锟斤拷锟饺凤拷锟斤拷锟絚锟斤拷锟缴減锟斤拷锟斤拷锟竭讹拷锟斤拷同锟斤拷锟絉锟絩(sh锟斤拷)木锟終锟絚锟絆(sh锟斤拷)锟戒安锟絙處锟斤拷锟劫帮拷锟絙锟絆(sh锟斤拷)锟斤拷锟斤拷锟斤拷锟斤拷D1锟斤拷
Place the wooden panel with the same height as the isolator at the installation before installing.(Fig 1)
锟饺岋拷锟教讹拷锟斤拷栓锟斤拷锟较诧拷锟斤拷帽取锟斤拷锟斤拷锟劫凤拷锟斤拷锟铰诧拷锟斤拷锟斤拷母使全锟斤拷锟斤拷栓锟铰斤拷锟斤拷锟皆凤拷锟姐將锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟诫安锟絙位锟斤拷锟斤拷锟斤拷锟斤拷D2锟斤拷
Rrmove the upper nuts from the fixed bolt.Loosen the lower nuts to descend the full-thread bolt to install the isolator.(Fig 2)
锟斤拷锟斤拷(j锟斤拷)锟斤拷栓锟教讹拷锟阶碉拷位锟斤拷锟斤拷锟絚锟斤拷锟絙位锟斤拷锟紸(y锟斤拷)锟斤拷锟斤拷A(ch锟斤拷)锟斤拷栓锟斤拷
Embed foundation bolt according to the location of bolt-loaded holes.
锟斤拷锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟矫碉拷锟絚锟絆(sh锟斤拷)锟斤拷锟斤拷锟斤拷_锟斤拷锟絙位锟斤拷锟斤拷锟斤拷锟斤拷D3锟斤拷
Place the isolator on the correct installation location.(Fig 3)

SHA锟酵忥拷锟缴減锟斤拷锟斤拷锟結(ji锟斤拷)锟斤拷(g锟斤拷u)锟紻锟斤拷
SHA Spring shock absorber Structure drawing
锟斤拷號(h锟斤拷o)/規(gu锟斤拷)锟斤拷 | L (mm) |
L1 (mm) |
L2 (mm) |
L3 (mm) |
H (mm) |
D (mm) |
M (mm) |
SHA-S | 153 | 123 | 105 | 71 | 120 | 12 | 12 |
SHA-M | 178 | 135 | 117 | 76 | 135 | 12 | 14 |
SHA-L | 209 | 175 | 1152 | 88 | 160 | 16 | 16 |
锟絳(di锟斤拷o)锟斤拷锟铰诧拷锟斤拷母使全锟斤拷锟斤拷栓锟斤拷锟斤拷锟斤拷锟絚锟絆(sh锟斤拷)锟戒安锟絙處锟斤拷锟斤拷锟斤拷锟较诧拷锟斤拷母锟絚全锟斤拷锟斤拷栓锟絠锟給锟斤拷锟斤拷锟斤拷D4锟斤拷
Adjust lower nuts to raise the full-thread bolt for the installation and slightly lock the upper nuts and full-thread bolt.(Fig 4)
使锟斤拷锟絖锟节帮拷锟斤拷锟斤拷順時(sh锟斤拷)針凤拷锟斤拷锟絳(di锟斤拷o)锟斤拷锟斤拷母使锟斤拷锟斤拷锟斤拷锟斤拷锟铰夛拷锟斤拷锟絳(di锟斤拷o)锟斤拷锟斤拷锟絉锟絩(sh锟斤拷)木锟絖(t锟斤拷i)锟斤拷取锟斤拷锟絩(sh锟斤拷)停止锟絳(di锟斤拷o)锟斤拷锟斤拷锟斤拷锟斤拷D5锟斤拷
Apply open wrench in the clockwise direction to press down the spring. Adjustment can be stopped and wooden panel can be removed once you can take out thepressure pad.(Fig 5)
锟斤拷锟教讹拷锟斤拷栓锟絖锟斤拷锟斤拷全锟絠锟給锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷F(tu锟斤拷n)锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟絙锟絳(di锟斤拷o)锟斤拷锟斤拷锟斤拷锟斤拷D6锟斤拷
After the adjustment,lock the isolator with fixed bolt.(Fig 6)
锟斤拷锟絙锟斤拷請(q锟斤拷ng)锟絲锟介彈锟斤拷锟铰夛拷锟斤拷锟斤拷锟界彈锟缴夛拷锟斤拷锟斤拷锟斤拷锟絫锟斤拷示锟斤拷锟截诧拷锟姐,锟絔锟叫減锟斤拷效锟斤拷锟斤拷锟斤拷(y锟斤拷ng)該锟斤拷锟絈锟絕锟斤拷锟斤拷氐膹锟斤拷蓽p锟斤拷锟斤拷锟斤拷號(h锟斤拷o)锟斤拷锟斤拷請(q锟斤拷ng)锟节憋拷锟斤拷司锟絀(y锟斤拷)锟斤拷(w锟斤拷)锟剿員聯(li锟斤拷n)系锟斤拷
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
锟斤拷锟絙锟絩(sh锟斤拷) 請(q锟斤拷ng)注锟解安全锟斤拷
Be cautious during the installation.
锟斤拷锟紹(y锟斤拷ng)锟街拷锟矫匡拷锟揭拷^锟斤拷CS锟教讹拷锟斤拷栓锟角凤拷锟斤拷锟缴勶拷(d锟斤拷ng)锟斤拷锟斤拷锟街忥拷锟缴減锟斤拷锟斤拷锟斤拷锟絙锟絩(sh锟斤拷)锟斤拷锟斤拷锟铰夛拷锟较讹拷锟角凤拷锟斤拷锟斤拷锟斤拷
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.
锟紻1锟斤拷锟斤拷锟絙锟絆(sh锟斤拷)锟斤拷r(sh锟斤拷)锟饺凤拷锟斤拷锟絚锟斤拷锟缴減锟斤拷锟斤拷锟竭讹拷锟斤拷同锟斤拷木锟絖(t锟斤拷i)锟斤拷
Fig 1锟斤拷Pace the wooden panel with the same height as the isolator at the installation before installing.
锟紻2锟斤拷锟教讹拷锟斤拷栓锟斤拷锟较诧拷锟斤拷帽锟斤拷取锟铰侊拷锟斤拷锟劫帮拷锟铰诧拷锟斤拷帽锟缴碉拷使锟斤拷栓锟铰斤拷锟斤拷锟皆便安锟絙锟斤拷
Fig 2锟斤拷Remove the upper nuts from the fixed bolt.Loosen the lower nuts to descend the bolt for the installation.
锟紻3锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟紽(tu锟斤拷n)锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟斤拷锟絆(sh锟斤拷)锟斤拷陌锟斤拷b锟阶诧拷位锟斤拷锟斤拷
Fig 3锟斤拷Place the isolator on the correct installation location.
锟紻4锟斤拷锟絳(di锟斤拷o)锟斤拷锟铰诧拷锟斤拷帽使锟斤拷栓锟斤拷锟斤拷锟斤拷锟斤拷锟絚锟絆(sh锟斤拷)锟斤拷锟紹锟斤拷锟斤拷锟劫岋拷锟教讹拷锟斤拷帽锟絠锟給锟斤拷
Fig 4锟斤拷Adjust lower nuts to raise the bolt to connect with the equipment and slightly lock the fixed nuts.
锟紻5锟斤拷锟斤拷锟絖锟节帮拷锟斤拷锟斤拷順時(sh锟斤拷)針凤拷锟斤拷锟絳(di锟斤拷o)锟斤拷锟斤拷帽锟斤拷锟絳(di锟斤拷o)锟斤拷*锟絉锟絩(sh锟斤拷)木锟絖(t锟斤拷i)锟斤拷锟斤拷取锟斤拷锟絩(sh锟斤拷)锟斤拷锟斤拷停止锟絳(di锟斤拷o)锟斤拷锟斤拷
Fig 5锟斤拷Apply open wrench in the clockwise direction to adjust the nuts.Adjustment can be stopped once wooden panel is removed.
锟紻6锟斤拷锟斤拷锟教讹拷锟斤拷栓锟絚锟絆(sh锟斤拷)锟斤拷锟斤拷全锟絠锟給锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷锟斤拷F(tu锟斤拷n)锟斤拷锟缴減锟斤拷锟斤拷锟斤拷锟絙锟絳(di锟斤拷o)锟斤拷锟斤拷
Fig 6锟斤拷After the adjustment锟斤拷lock the isolator with fixed bolt.