Before installation,make sure the model and the specification are correct.
锟斤拷锟絙锟絝锟斤拷
Installation guide
锟斤拷锟借工锟竭o拷锟斤拷锟狡口忥拷17mm锟斤拷M10锟斤拷锟斤拷19mm锟斤拷M12锟斤拷锟斤拷24mm锟斤拷M16锟斤拷锟絖锟节帮拷锟街★拷
Required tools锟斤拷17mm锟斤拷M10锟斤拷锟斤拷19mm锟斤拷M12锟斤拷锟斤拷24mm锟斤拷M16锟斤拷open wrenches.
锟絲锟介附锟斤拷锟角凤拷锟絉全锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟角凤拷锟斤拷缺锟捷伙拷锟狡損锟斤拷锟斤拷锟斤拷D1锟斤拷
Check the isolator and other accessories see if they are all completely or having any defects.(Fig 1)
锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟脚碉拷锟絆(sh锟斤拷)锟斤拷陌锟斤拷b位锟矫★拷锟斤拷锟斤拷D2锟斤拷
Place the isolator on the correct installation position.(Fig 2)
锟絠锟給锟斤拷母锟酵墊片锟斤拷锟絖锟斤拷锟絆(sh锟斤拷)锟斤拷锟斤拷锟斤拷z锟絧锟斤拷锟斤拷锟教讹拷锟斤拷位锟斤拷锟斤拷锟斤拷D3锟斤拷
Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.(Fig 3)
STR锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟結(ji锟斤拷)锟斤拷(g锟斤拷u)锟紻锟斤拷
STR type rubber shock absorber Structure drawing:
STR锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟斤拷锟斤拷(sh锟斤拷)锟斤拷锟斤拷
STR type rubber shock absorber parameter table:
锟斤拷號 Model |
L (mm) |
W (mm) |
H (mm) |
CS (mm) |
A (mm) |
B 锟斤拷mm锟斤拷 |
锟絛锟缴o拷kg锟斤拷 | |
Min | Max | |||||||
STR-100 | 95 | 53 | 48 | M10 | 77 | 10 | 50 | 150 |
STR-130 | 127 | 77 | 70 | M12 | 101 | 14 | 150 | 450 |
STR-180 | 180 | 118 | 70 | M16 | 149 | 14 | 450 | 1000 |
锟紻1锟斤拷锟絲锟介附锟斤拷锟角凤拷锟絉全锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟角凤拷锟斤拷缺锟捷伙拷锟狡損锟斤拷
Fig 1锟斤拷Check the isolator and other accessories see if they are all completely or having any defects.
锟紻2锟斤拷锟斤拷锟斤拷锟絲锟絧锟斤拷锟斤拷锟脚碉拷锟絆(sh锟斤拷)锟斤拷陌锟斤拷b位锟斤拷锟斤拷
Fig 2锟斤拷Place the isolator on the correct installation position.
锟紻3锟斤拷锟絠锟給锟斤拷母锟酵墊片锟斤拷锟絖锟斤拷锟絆(sh锟斤拷)锟斤拷锟斤拷锟斤拷z锟絧锟斤拷锟斤拷锟教讹拷锟斤拷位锟斤拷
Fig 3锟斤拷Fasten the nuts and washers to ensure the equipment feet holes are fixed to the isolator.